Step-by-Step house planning Process & timeline

With more than 20 years of robust experience in house planning, today we stand as a comprehensive design firm and ready to contribute every facet of your project, drawing on our extensive experience in both design and construction.

Designing a custom home is an exciting journey. To give you peace of mind and complete clarity, we break our process down into five distinct phases. While every project varies, a typical custom home design takes 25-30 days from the initial consultation to approval ready blue prints.

Step 1: Site visit, initial consultation and conceptual design preparation - 3 Days

Our team visits the plot (Specially crucial in Kandy, Matale, Rathnapura, Kegalle and Nuwara Eliya to assess the slop\terrain), checks sun/wind orientation, reviews conditions, and discuss the client’s vision, aesthetic preferences, functional needs, budget, room requirements, and Vasthu preferences.

Step 2: Technical 2D drawing preparation including structural and MEP drawings - 10 Days

Our architects draft the initial layout options and present you the preliminary 2D floor plans showing room dimensions, door/window placements, and overall spatial flow. Structural engineers create the technical blueprints. This includes foundation details (Crucial retaining walls for hill country plots), column layouts, slab reinforcements, and MEP (Mechanical, Electrical and Plumbing) mapping.

Step 3:
Preparation of Municipal council, Urban council, Pradeshiya shaba, NBRO and UDA approval documentation - 2 Days

We compile the final “ Municipal Set” drawings, sign off with chartered professionals, and prepare the files for submission to the local councils legal clearance.

If your land is in a steep or hilly region, National Building Research Organization (NBRO) certification is secured during this window.

Step 4:
Complete Bank-Ready plan set including BOQs - 1 Day

Using the approved plans and the financial backbone of the mortgage loan “Priced Bills of Quantities (BOQ), documentation will be finalized for bank loan disbursement if external financing is required.

Sri Lankan banks (such as BOC, HNB, Sampath Bank or Commercial Bank) require a highly specific, un- inflated BOQ and a local council approved building plan before they release the housing loan. Working with Kedella Homes that formats these documents to standard banking guidelines saves weeks of back and forth adjustments.

Step 5:
3D Architectural rendering: Interior and Exterior visualization - 9 Days


Once the 2D layout is locked in, we convert it into a realistic 3D model. The client gets to see exactly what their home will look like from the outside, including roof styles, color schemes, and material textures.

Comprehensive Overview of Our Professional House Design Services & Time Schedule


Service Category Key Deliverables Best For Days
Conceptual Design Preparation Site analysis, 2D Floor Plans and Basic 3D Perspectives. Visualizing the initial look and layouts. 3
Technical 2D Drawings. Structural Designs, Electrical/Plumbing Layouts,
Roof Plans, Foundation Plan etc.
Safe construction and contractor bidding. 10
Council Approval Services. Local council ( UDA / MC / UC / Pradeshiya Shabawa )
stamped plans.
Legal compliance and Building permits. 2
Mortgage/Bank Loan Support. Detailed Bills of Quantities and Professional Cost Estimations. Securing housing loans (NTB,
HSBC, Amana Bank, PABC, etc.).
1
Exterior & Interior
3D Visualization.
Furniture layouts, lighting plans, material/color schemes. Enhancing the aesthetics and
feel of living spaces.
9
Construction Site Supervision. Periodic site visits, Quality checks,
and Contractor Management.
Ensuring the build matches
the approved design.
-
Table: Standard timeline and schedule for delivering a complete architectural house plan package in Sri Lanka.

Frequently Asked Questions Related to House Planning Process & Timeline

Can I make changes to the design once construction has started?

Yes. But it can be costly. Changes made on paper during the design phase cost very little. Changes made once the concrete is poured or walls are framed require “Change Order” with your builder, which usually incur significant material and labor fee.

How many days does it take to complete a custom house plan?

The timeline to complete a comprehensive house plan typically ranges from 25 to 45 days. Because a great house plan requires a balance of architectural creativity, structural engineering, and client feedback and the process moves through several distinct phases.

Build Your Vision with Expertise

At our office, a team of Chartered Architects and experienced builders is ready to bring your dream home to life. With a foundation of deep expertise and a total commitment to your vision, we don’t just build houses—we design homes.